Post Fondation T/L 150kV Marisa Moutong Section 2 TIP 103 – 142 This project start from 28-06-2021, we make access road to tower location for better progress. Finished on 03-10-2021 ( Total 31 Tower ).
Post 500kV Deltamas Project Galang Solusi Teknik, Dismantling & Re- packing HV Apparatus Diameter 5 & 6 at Gitet 500kV Deltamas. The HV Apparatus will installed at Gitet 500kV Mandirancan and aslo the Construction include installation and testing worked by us.